Page  12.10   Emp Fairings
12.01 12.02 1203 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11
Step 01: Locate a nutplate, using a #6 screw, through one of the #27 fairing attach holes in the aft of the Tailcone Assembly. Bend the nutplate attach tabs as necessary to conform to the tailcone skins.  
Step 02: Match-Drill using an extended #40 one of the nutplate attach rivet holes into the Tailcone Assembly. Cleco that hole. Then match-drill #40 the remaining nutplate attach rivet hole. Mark the location of each nutplate.

Repeat Step 1 and 2 for all of the fairing attach nutplates.
 
Step 03: Tap the called out nutplates half way through the screw hole per call-out in figure 1.  
Step 04: Dimple, using a 3/32 die, the #40 nutplate attach rivet holes in the Tailcone Assembly per call-outs in Figure 1.  
Step 05: Dimple, using a3/32 die, the attach rivet holes in the nutplates called out in Figure 2.  
Step 06: Rivet the nutplates to the tailcone per marks made in Step 02, and call-outs in Figure 1.  
Step 07: Drill a 3/4 inch hole using a step drill bit within the scribe line at the bottom of the F-1294B Lower Tailcone Fairing as shown in Figure 3.  
Step 08: Install the Trim Servo Assembly, Refer to Section 11 Page 07 for attachment instructions.  
Step 09: Refer to Page 11-08 for temporary Trim Servo Assembly actuation instructions. Actuate the Trim Servo Assembly to be fully retracted.  
Step 10: Attach the F-1294A & B Upper and Lower Tailcone Fairings to the Tail Assembly.  
Step 11: Check the clearance between the Trim Servo Assembly and the F-1294A & B Upper and Lower Tailcone Fairing throughout the Stabilator Assembly travel as shown in Figure 4. If necessary, mark then trim the upper and lower tailcone fairings to provide at least 1/8 inch clearance for the Trim Servo Assembly.

Remove the upper and lower tailcone fairings.
 
Step 12: Repeat Step 08 through 10 with the Trim Servo Assembly fully extended.  
   
VERTICAL STAB RUDDER ANTI-SERVO TAB  STABILATOR TAILCONE EMP ATTACH  EMP FAIRINGS  BUILDERS LOG
Drill Chart Tap Chart Bolt Chart Nut Chart Rivet Chart Washer Chart Rod Ends Vendors Shop Home
 

Disclaimer : Information contained on this Site may be out of date and /or inaccurate - Please Confirm any important data with a reliable source.